Details
House has Steel Siding and in April, 2024 had new roof. Garage was built in 1994 has Vinyl Siding with new roof in April, 2024. All bedrooms do not have closets but they do have windows. Walk up attic is floored which could be modified for additional living space. Lot was re-surveyed in January, 2024. Basement has sump pump. DO NOT TURN SWITCH OFF AT TOP OF STAIRS WHICH POWERS THE PUMP IF NEEDED. Use caution going down the stairs, they are steady but narrow.