Details
Waterfront lot ready for a new home or camp on the dead end of the waterway with no through traffic. 15 - 16 x 16 rebar embedded concrete piles installed in 2020. Two boat slips. Oversized deck. Railings and stairway are not stable. DO NOT access the deck.